The water purification plant required the construction of a 17.3 x 5.5 m building. The purification equipment meets the needs of a 38.25 m3/h flow and a consumption of 648.5 m3.
In order to store the treated water, a circular concrete tank with a bowl of 11 metres diametre and 4.5 metres depth was constructed.