All streets have several stretches where excavations were made both in the ditches and in the trenches. Different brick galleries were constructed with their respective ducts, as in the case of Sewer E-I that passes the Alameda street and crosses the whole fairground, and Sewer A-II that crosses the Cañada Avenue up to the junction with the José Garate street.